The 2nd Witch is in is finished.
It was on my 2010 list and I'm glad it's done and put away.
I didn't say anything but I caved further on Thursday; I took my laptop down to my sewing space and pieced
The 12 Days of Christmas from Temecula Quilt Co

I think I might hand quilt it.
I say that because this is what HQ looks like right now.
GASP!
That black piece on the table is the bottom side of my track upgrade. We started putting it together this afternoon, well I supervised cleaned up the boxes; Paul is doing the actually assembly.
And then the phone rang.
He got called into work.
Always the way it goes.
*******
This morning was the guild's newbies class. It was a very informative class. I enjoyed it very much and from an April Cornell charm pack I made this
I think it will be a spring table topper.
I only have 6-7 charms left, looking at the photo now I think I will make two more blocks and call it a table runner.
I'm very close to having all the little flying geese made for my Small Treasures quilt. I had to cut out a bunch more 1.5" squares for it.
****